Our plant The plan of the company on October — November 2010

  1. The reinforcement shop:
    1. Roofing;
    2. Installation of sandwich-panels;
    3. Installation of windows;
    4. Installation of entrance gate;
    5. Strewing with crushed stone the foundation of the building;
    6. Installation of the ceiling;
    7. Construction of domestic buildings.
  2. The domestic building.
    1. Interior decoration of the building.
    2. Roofing;
    3. Installation of windows.
  3. Check points ¹ 1 & ¹ 2.
    1. Construction of buildings;
    2. Construction of foundations;
    3. Sanding;
    4. Strewing with crushed stone;
    5. Installation of ñòîåêïîäíàâåñ;
    6. Roofing.
  4. 80 % of the territory should be sanded and strewed with crushed stone
  5. The installation of the filler structure (fence) around the whole territory should be completely finished.
  6. The laying of the fire line, water supply system, sewerage system and rainwater disposal on all four stages with the installation of two treatment facilities and sewer pumping plant.